Wednesday, June 4, 2008

Kitchen Floor Day 2

The kitchen is almost done. Day 2 the floor got finished and a second coat of paint went up on the wall. The dish washer is back in the kitchen and reinstalled.

Two transitions will be put in as well. One that connects the living room with the kitchen and one that connects with the dining room and kitchen. A thin strip of the carpet had to be cut away in order to make the transition fit correctly.

Everything should be all wrapped up by Thursday. The base boards and window sills still have to be painted white. Once the contractor is done, Buck is gonna come over and install a new light fixture.


Transition To Living Room


Pantry

Transition To Dining Room


Space Where The Fridge Should Be


Finished Floor and Paint

No Stove Yet



Looking In From The Dining Room