Saturday, June 7, 2008

Kitchen Floor Day 3

Day 3 was a pretty short day. Just a few left over things that had to be done. The transitions for the living room and dining room were installed, the base boards and window sills were painted white, and our door to the backyard was refitted to fit the frame better.

Everything from the contractor is now done. All that is left is for Erin and I to move all of the stuff back into the kitchen and hang everything up. We got most of it done on Friday.

Saturday Buck is coming over to hang the new light that is going over the kitchen table.



Erin "Redecorates" The Fridge

Kitchen To Living Room Transition


Finished Product -- Nothing Added Back Yet


Looking Into The Living Room


1 comment:

Unknown said...

gayest picture ever of Buck stays